Filtrar

Zozaya Offices

TextClose Text

Zozaya Offices

This project is thought to be designed and built from the maximum economic and constructive efficiency. To achieve this, we use prefab concrete pillars and alveolar slabs.

The building’s minimum unit is the triangular pillar 1,15cm wide. It is repeated 18 times along the façade, and it is strathegically placed to perform as a “brise-soleil” and protect the building from the solar incidence, since the building is completelly isolated.

Site: Zona Franca, Barcelona
Status: Commissioned
Program: 800 sqm
Client: Zozaya Cisternas SL